Paint Inspection Ltd

ENERGY & INDUSTRIAL

Dolgarrog Low Head Pipeline Coating Survey

Dolgarrog Low Head Pipeline Coating Survey

Historical case study, 2017. Paint Inspection Ltd completed a coating condition survey of the Low Head Pipeline at Dolgarrog Power Station in Conwy for Innogy RWE Group.

THE PROJECT

The inspected section measured 600 m in length and 1.2 m in diameter. Its confined and substantially inclined geometry required a controlled approach to access, inspection and rescue provision.

OUR INVOLVEMENT

A five-person rope-access and confined-space team managed access and egress, rescue cover and internal inspection. The work included cleaning followed by visual assessment of the existing coating condition.

TECHNICAL APPROACH

Visual assessment of coating degradation and corrosion was carried out in accordance with ISO 4628. Adhesion and dry film thickness checks supplemented the visual findings. Information from 90 pipe sections was compiled into the project report.

RELEVANT SERVICES

Access & Drone Surveys Condition Surveys Testing & Analysis Technical Reporting Technical Consultancy

THE OUTCOME

The detailed report provided repair recommendations and assessed the suitability of overcoating and patch repair options.

ILLUSTRATIVE IMAGERY

Illustrative infrastructure imagery — not project-specific.

var(--variable-z32RGQ_Le)

RELATED EXPERTISE

Inspection · Condition Surveys · Testing & Analysis · Technical Consultancy

PLANNING A SIMILAR PROJECT?

Bring independent coating expertise into your project.

Talk directly to Paint Inspection Ltd about inspection, condition assessment, testing or technical support.

DISCUSS YOUR PROJECT →